INVESTOR INFORMATION

Partner with MariGoldX

Staged exploration funding or a project partnership to advance the next phase of CAUR exploration.

BASIS FOR DISCUSSION

A technical programme.
Clear decision points.

We welcome discussions with investors and mining partners to fund the next phase of CAUR exploration.

Joining MariGoldX means helping advance CAUR and sharing our long-term objective: to identify Chile’s next major copper deposit.

Agree a technical work programme, budget, milestones and a suitable investment or joint-venture structure.

MARICUNGA GOLD BELT

CAUR positioning in the district

Regional gold estimates are shown by reserve and resource category. CAUR remains at exploration stage with no mineral resource or reserve.

Reported peer gold estimates by category P&P reserves, M&I resources and Inferred resources remain separate. Fenix M&I includes its reserves. Dates and ownership bases are set out in the disclosure table below.

COMPANY DISCLOSURES · CHECKED 7 NOVEMBER 2026

Regional peer comparison

Gold is reported in million ounces of gold (Moz Au). Each quantity retains its reserve or resource classification, effective date and ownership basis.

Maricunga peer gold disclosures Norte Abierto is reported as the combined Caspiche–Cerro Casale venture. Its 100% quantities derive from Newmont’s disclosed 50% share.

Swipe horizontally to see all categories and sources.

Company-reported contained gold, in Moz Au. Categories are separate and must not be added where they overlap.
ProjectP&P reservesM&I resourcesInferred resourcesResource basisEstimate dateSource
Salares NorteGold Fields3.1360.2410.009M&I excludes reserves100% project31 Dec 2025Disclosure ↗
La CoipaKinross0.4362.1280.188M&I excludes reservesKinross reported share31 Dec 2025Disclosure ↗
Fenix GoldRio21.7724.7570.959M&I includes reserves100% project2023 FS¹Disclosure ↗
Lobo-MarteKinross6.7332.7520.670M&I excludes reserves100% project31 Dec 2025Disclosure ↗
VolcanTiernan Gold—9.8041.246No reserves declared100% project22 Jul 2022²Disclosure ↗
Maricunga / RefugioKinross—7.1404.876M&I excludes reserves100% project31 Dec 2025Disclosure ↗
Norte AbiertoNewmont / Barrick21.60020.20010.600M&I excludes reserves100% JV³31 Dec 2025Disclosure ↗

P&P means Proved/Proven and Probable reserves. M&I means Measured and Indicated resources. A dash means no reserve figure is reported in the selected disclosure. Resources and reserves have different levels of confidence and economic assessment.

¹ Fenix resources are effective 1 April 2023 and reserves 11 May 2023. Its M&I resources include its reserves. ² Volcan uses the 22 July 2022 estimate retained in the 2025 PEA. ³ Norte Abierto combines Caspiche and Cerro Casale. Each displayed JV quantity is twice Newmont’s reported 50% share. La Coipa follows Kinross’s reported interests in its deposits.

Disclosures checked 7 November 2026. Dates and reporting bases vary. Peer estimates are not attributable to CAUR.

Explore the historical discovery comparison and the work needed to test CAUR’s geological model.

View the exploration comparison ↗

HISTORICAL ANDEAN COMPARISON

Regional mines grew beyond their initial reserves

Discovery begins the delineation process. Continued drilling can expand the mineralised footprint and establish grade continuity.

This historical comparison brings initial reserves together with subsequent production and reported remaining inventories. Gold Fields published this historical comparison in April 2019. Most remaining inventories are dated December 2015; the marked Salares Norte row uses its December 2018 maiden reserve.

Swipe horizontally to see all columns.

Historical initial reserves, production and remaining inventory. Moz AuEq means million ounces of gold equivalent. The marked Salares Norte row is gold-only (Moz Au).
MineInitial reserves
Moz AuEq
Produced
Moz AuEq
Remaining inventory
Moz AuEq, except marked row
Growth multiple
El Indio2.57.2Closed 20022.9×
La Coipa3.77.6Care & maintenance2.1×
Yanacocha4.036.211.311.9×
Pierina6.18.2Closed 20141.3×
Lagunas Norte6.99.15.72.1×
Veladero8.47.110.92.1×
Salares Norte¹3.47 Au—3.47 AuNot applicable

Growth multiple = (production + reported remaining inventory) ÷ initial reserves. Closed or care-and-maintenance rows use production only. Inventory growth may reflect drilling, prices and technical assumptions as well as changes in reserves.

¹ The Salares Norte row is 3.47 Moz Au in December 2018 maiden reserves, plus 39.2 Moz Ag reported separately. It is gold-only; the other rows are gold equivalents. No growth multiple is calculated.

Historical source: Gold Fields, Salares Norte presentation, 10 April 2019 ↗. These historical peers do not predict CAUR results. CAUR has no mineral resource or reserve.

CAUR · CONCEPTUAL EXPLORATION

Conceptual exploration scenarios and milestones

CAUR comprises 7 exploration concessions covering 2,100 ha, with expansion opportunities under evaluation.

The ranges below are unverified management scenarios. Tonnage, grade and economic potential remain unestablished. CAUR has no mineral resource or reserve.

CAUR · conceptual exploration scenarios Illustrative concepts from the original graphic, not a mineral resource, reserve or formally defined exploration target. No supporting tonnage-and-grade basis is presented. The scenarios are presented separately from the company-reported peer estimates.
Read the illustrative scenario figures
Unverified management scenarios
ScenarioIllustrative contained gold (Moz Au)
Conservative1–3
Base case3–7
Upside case7–12+

CAUR value creation roadmap

Each later stage depends on exploration results, funding, permits and the appropriate technical studies.

The proposed first phase combines high-sulphidation Au–Ag modelling, ASTER/HSI targeting, geological and alteration mapping, geochemical sampling for gold and pathfinder elements, and targeted ground magnetics and CSAMT/IP surveys. Early validation will guide drill-target selection, supported by persistent, systematic work, supportive management, consistent budgets and local technical autonomy.

  1. Data compilation and geological modelling
  2. Geophysics, SWIR and alteration mapping
  3. 3D geological model and target definition
  4. Drill testing and mineralised footprint
  5. Maiden mineral resource estimate (NI 43-101)
  6. Resource expansion
  7. PEA or scoping study
  8. Development pathway
View the original roadmap graphic
CAUR · value creation roadmap Conceptual exploration-to-development sequence. Resource estimation and development stages are conditional milestones, not completed work.

DEVELOPMENT CONCEPT & ECONOMIC MILESTONES

Evidence before economics

CAUR’s immediate objective is a drill-tested geological model. Development options depend on discovery, resource definition and metallurgical results.

A shallow oxide gold opportunity could support an open-pit, heap-leach concept if grade, continuity and recoveries prove suitable. Oxide depth, mineable geometry and processing performance remain to be established.

Open-pit mining context Illustrative mining scene. CAUR remains an exploration project and has no mineral resource or reserve.

Evidence required for economics

  • Resource estimate and mine design
  • Metallurgical recovery and process selection
  • Capital, operating costs and infrastructure
  • Permitting, water supply and funding

Production, NPV, IRR, payback and project valuation require supporting technical and economic studies.

INVESTOR INFORMATION · CONCEPTUAL ECONOMICS

Conceptual investment snapshot

Earlier illustrative economics and development assumptions for investor discussion.

Conceptual economics

Stage
Drill-tested gold exploration
Gold price assumption
US$3,850/oz
Conceptual NPV (8%)
US$650M – US$850M
Conceptual IRR
45% – 70%
Payback period
~2 years
Target valuation
US$180M – US$320M

Development concept

Production target
~100,000 oz/year
Initial capex
~US$200M
LOM AISC
~US$1,400/oz
Development model
Open-pit, heap leach
Resource target
1 – 2+ Moz Au

These figures are conceptual, preliminary and for investor discussion only. CAUR does not yet have a mineral resource or reserve estimate; all valuation and development assumptions remain subject to drilling, metallurgy, permitting, funding and independent verification.

Partner with MariGoldX Staged exploration funding or a project partnership. Agree a technical work programme, budget, milestones and a suitable investment or joint-venture structure. Management contacts: Fred Clement and Ariel Navarro.

IMPORTANT TECHNICAL INFORMATION

Read the project in context

CAUR has no mineral resource or reserve. Potential remains unquantified and conceptual.

Historical exploration and gold results

Historical exploration results are company-reported and subject to verification against original logs, assays and QA/QC records. Drill interval lengths do not establish true widths. Rock-chip samples are selective and may not represent the wider property.

The reported gold intervals and rock-chip grades are management-supplied historical information. The 6 October 2021 release documents the drill programme and alteration but does not state those gold intervals.

Exploration stage and regional analogues

No CAUR mineral resource or reserve estimate is presented. Exploration concepts, alteration footprints and nearby deposits do not establish an economic deposit at CAUR. There is no certainty that exploration will define a mineral resource.

Regional deposits provide geological context only. Their resources, grades, production and economics are not attributable to CAUR. Hyperspectral imagery identifies surface minerals and does not establish gold grade or continuity.

Property information and confidentiality

The stated 2,100 ha across 7 exploration concessions, with expansion opportunities under evaluation, reflects management’s update. Current title records, boundaries and any transfer arrangements require confirmation during due diligence.

This site excludes sensitive coordinate listings and raw location datasets. Map outlines are indicative, and historical sample and drill positions must be checked against current CAUR titles.

Forward-looking information

Planned work depends on funding, access, permits and results. Scope and timing may change. The proposed 3,000–6,000 m drilling programme will be refined after Phase 1. Resource definition and development studies follow only if results justify them.

This site is for discussion and does not set investment terms. The CAUR exploration scenarios are unverified management scenarios, not a mineral resource, reserve or formally defined exploration target. No supporting tonnage-and-grade basis is presented. The financial snapshot reproduces earlier conceptual assumptions, not an independently verified project valuation.

Sources and presentation material

Historical drilling and alteration: Historical drilling release, 6 October 2021 ↗. Management-supplied grades remain subject to original-record verification.

Hyperspectral mapping and interpretation: Geostein, September–October 2026. Visit Geostein ↗.

The presentation and detailed technical information can be requested from the team for controlled review.

Forward-Looking Statement & Competent Person

This Presentation contains "forward-looking statements". These forward-looking statements are made as of the date of this Presentation and MariGoldX does not intend, and does not assume any obligation, to update these forward-looking statements. Forward-looking statements include, but are not limited to, statements with respect to the timing and amount of estimated future exploration, success of exploration activities, expenditures, permitting and requirements for additional capital and access to data to include historical data made available in the public domain utilised for this presentation.

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements.

Such factors include, among others, risks related to actual results of current exploration activities; changes in project parameters as plans continue to be refined; the ability to enter into joint ventures or to acquire or dispose of property interests; future prices of mineral resources; accidents, labour disputes and other risks of the mining industry; ability to obtain financing; and delays in obtaining governmental approvals or financing.

Competent Person: Ariel Navarro

Master’s Degree in Economic Geology

Ariel Navarro is the Qualified Geologist and has reviewed the scientific and technical information contained in this presentation. Ariel Navarro is the President of the company with extensive knowledge of the Maricunga Gold Belt, Chile.

Project image